Customization Concrete Moulds for Stationary Block Making Machine
Design feature of Hawen Concrete moulds
Hawen High-Quality Concrete Mould is designed for precision, durability, and efficiency in producing uniform and strong concrete blocks, pavers.
Here are its key design features:
1. High-Strength Material Construction
• The moulds are made from high-grade alloy steel, manganese steel, or hardened carbon steel for durability.
• Heat-treated and wear-resistant to withstand continuous production cycles.
• Rust-proof and corrosion-resistant coatings to extend lifespan.
2. Precision Engineering for Accuracy
• CNC machining and laser cutting ensure precise dimensions for uniform blocks .
• Tight tolerances reduce variations, improving block consistency.
• Smooth inner surfaces for clean, well-defined edges and surfaces.
3. Modular & Interchangeable Design
• Quick-change mold system allows for fast swapping of different block designs.
• Can produce various block types (hollow, solid, paver, interlocking, curbstones, etc.).
• Compatible with different block-making machines, including automatic and hydraulic models.
4. Reinforced Structural Design
• Thick mold walls to withstand high-pressure compaction and vibration.
• Reinforced welding and bracing to prevent deformation under heavy loads.
• Vibration-optimized design ensures uniform material distribution.
5. Efficient Demolding & Longevity
• Non-stick coating and special surface treatment reduces concrete adhesion.
• Self-cleaning design minimizes residue buildup, reducing downtime.
• Long service life, even under high-volume production conditions.
6. Customization & Versatility
• Can be custom-designed for specific project needs and block sizes.
• Compatible with different raw materials, including concrete, fly ash, and lightweight aggregates.
• Supports multi-pattern and texture options for decorative or structural blocks.
7. Eco-Friendly & Cost-Effective
• Optimized design reduces material wastage and maintenance costs.
• Energy-efficient features improve overall production sustainability.
• Recyclable and reusable, reducing environmental impact.
Professional and Unique Heat Treatment
The use of the advanced multi-functional heat treatment,all processes are controlled by the PLC, without any manual intervention, and the result of heat treatment is ensured from multiple angles.

Details of our mold
Painting and Packing of ready moulds. Using seaworthy long distance transportation packing with pallet tray on bottom,packing straps and film wrapping.
Different shapes of Concrete Products Moulds available based on customized manufacturing drawings.
Block Application:

Our Patents
Welcome to visit our factory!
FAQ
1:How many square meters required to set up a block factory?
Generally,the whole factory requires 3000~5000 square meters according to different size of machine, including the recommended workshop to cover the equipments at 500 square meters,equipments are suggested to keep under the shed.
2:What kind of material can be used to produce concrete block?
Crushed stone(Max.10mm),sand and Cement as raw material, coal fly ash, cinder, slag,gangue, gravel, and other industrial wastes.And if customer makes the top colored paving stone,then the face material of fine sand and white cement and pigmen are required.
3:Can I get the warranty for the machine?
The warranty for the machine is one year after installation or 15 months after shipment,whichever comes first.Spare parts will be sent to customers for free of charge during the warranty period. Warranty does not cover the wearing parts, in cases of incorrect handling, improper user, insufficient maintenance, unauthorized service or modifications to the machine, normal wear .
4:What is the delivery time?
The delivery time is 30-40 days upon receiving the down payment and mould drawing approval from customer.
5:What about your payment terms?
T/T and L/C are acceptable.
Generally,it requested to pay 30% as depoist by T/T before production, and the balance to be paid by T/T or Irrevocable,Confirmed LC at sight before shipment.
6:How to prepare the foundation for the equipments?
The foundation drawing for the whole plant will be provided within 07 days after the order confirmed,customer could prepare the foundation construction according to the drawing provided.
7:How about the installation & commissioning ?
After the equipments arrive customer's site,and the preparation for the foundation,water & electricity are ready,we will send 1 of our technician for the installation & commissioning,the technician will train customer's staff for the operation and maintenance of equipment.
8:How about the installation cost?
Customer is responsible for round-way airline ticket,hotel&meals as well as the allowance at USD120/day.
9:Are the machine be tested in your factory before shipment?
Yes all of our machines will be tested in our workshop before container loading.You are warmly welcome to do the inspection before shipment.
10:Can I visit your factory before placing the order and where is your factory ?
You are warmly welcome to visit our factory any time.Our factory located in Quanzhou City,Fujian Province.
The nearest airport to our factory is Jinjiang airport,which is 30 minutes to our factory by car.
How to come to your city?
You could take the international flight to Guangzhou airport first,then take the domestic flight from Guangzhou airport to Jinjiang airport,we will pick you up from Jinjiang Airport.
Or take the high speed train From Guangzhou South to Quanzhou train station.