1. How many square meters required to set up a block factory?
Answer:Generally,the whole factory requires 5000 square meters, including the recommended workshop to cover the equipments at 500 square meters,equipments are suggested to keep under the shed.
2.What kind of material can be used to produce concrete block?
Answer:Crushed stone(Max.10mm),sand and Cement as raw material, coal fly ash, cinder, slag,gangue, gravel, and other industrial wastes.And if customer makes the top colored paving stone,then the face material of fine sand and white cement and pigmen are required.
3.Can I get the warranty for the machine?
Answer:The warranty for the machine is one year after installation or 15 months after shipment,whichever comes first.Spare parts will be sent to customers for free of charge during the warranty period. Warranty does not cover the wearing parts, in cases of incorrect handling, improper user, insufficient maintenance, unauthorized service or modifications to the machine, normal wear .
4.What is the delivery time?
Answer:The delivery time is 30-40 days upon receiving the down payment and mould drawing approval from customer.
5. What about your payment terms?
Answer:T/T and L/C are acceptable.
Generally,it requested to pay 30% as depoist by T/T before production, and the balance to be paid by T/T or Irrevocable,Confirmed LC at sight before shipment.
6.How to prepare the foundation for the equipments?
Answer:The foundation drawing for the whole plant will be provided within 07 days after the order confirmed,customer could prepare the foundation construction according to the drawing provided.